kw.\*:("Connexion sous-marine")
Results 1 to 14 of 14
Selection :
Installation of guying system Lena guyed towerBROWN, C. P; FONTENETTE, L. M; DOVE, P. G. S et al.Offshore technology conference. 16. 1984, pp 309-318Conference Paper
Flowlines connected with mechanical joining systemOffshore (Conroe, Tex.). 1985, Vol 45, Num 7, pp 46-47, issn 0030-0608Article
Forged connection joins misaligned pipesOffshore (Conroe, Tex.). 1985, Vol 45, Num 6, issn 0030-0608, 92Article
Deepwater pipeline repair systemBONVECCHIATO, G.European Communities symposium. 2. 1985, pp 1069-1075Conference Paper
Multiple ROVS used in TLP installationNUTTALL, J.Offshore (Conroe, Tex.). 1984, Vol 44, Num 10, pp 72-79, issn 0030-0608Article
ROVS find multiple deep water applicationsMICHEL, D.Offshore (Conroe, Tex.). 1984, Vol 44, Num 10, pp 65-70, issn 0030-0608Article
Maintenance of subsea equipment: Experimental programmes on Grondin North-East StationTHIBERGE, P. L. H.European Communities symposium. 2. 1985, pp 612-620Conference Paper
Modular subsea production system ― the MSPSROBLIN, J. P.European Communities symposium. 2. 1985, pp 478-484Conference Paper
More research needed on deepwater pipelinesBURKE, R. G.Offshore (Conroe, Tex.). 1987, Vol 47, Num 5, pp 47-49, issn 0030-0608Article
Study finds few problems in subsea well control unitsOffshore (Conroe, Tex.). 1985, Vol 45, Num 6, issn 0030-0608, 103Article
Concrete TLP tie-down procedureSPARKS, C; MANESSE, J. P.Petroleum engineer international. 1985, Vol 57, Num 9, pp 34-40, issn 0164-8322Article
Riser conversion on Thistle «A» platformLOWES, J. M; HUNTER, K. C; LOVELL, J. M et al.Worldwide subsea challenge. Conference. 1983, pp 1-15, 15 p.Conference Paper
Deep-sea offshore productionCASTELA, A; SIMONDON, D; COULBOY, R et al.European Communities symposium. 2. 1985, pp 585-594Conference Paper
Laying and connection of flowlines in great depth of waterRENARD, B; COULBOY, R; CASTELA, A et al.European Communities symposium. 2. 1985, pp 602-611Conference Paper